Faster than pen & paper. Built for hypertrophy.

GymPsycho is the privacy-first hypertrophy workout tracker for iOS, Android, Apple Watch, and Wear OS in 2026. Track PRs, follow AI-generated science-based plans, and hit per-muscle MEV/MAV/MRV volume targets — no account required, all data stays on your device.

5.0 loved by 100+ athletes on iOS + Android
GymPsycho workout tracker app - iPhone showing training session with PR tracking and AI weight suggestions

Everything You Need

Built on a curated exercise library with animated demonstrations. Professional tools. No fluff.

Training Intelligence

Progress Check per muscle, plateau detection, volume analysis & smart weight suggestions. All on-device.

Explore Training Intelligence →

Plan Generator

Personalized training plans in 60 seconds. Science-based, tailored to your goals, experience & equipment.

PR Celebrations

Real-time PR detection during training. Instant celebrations on iPhone & Watch.

Apple Watch & Wear OS

Your live set on your wrist. Rest timer, heart rate, PR alerts. Native apps for Apple Watch, Pixel Watch and Galaxy Watch.

Multi-Gym Support

Train at multiple studios with separate PRs, exercises & weight units.

Hypertrophy Volume Tracking

Science-based weekly sets per muscle (MEV/MAV/MRV). Stay in the productive range — no junk volume, no overtraining.

Pro Reports

Professional PDF workout reports with full training history and volume analytics.

Training Maturity

6 tiers from Starter to GymPsycho. Earn your rank through effort, consistency, and PRs.

Import from Hevy, Strong & Alpha Progression

Switching apps? Import your entire training history with one tap. AI insights from day one.

Supersets & Set Types

Supersets and giant sets with guided alternation — plus warm-up, drop & failure tagging and optional per-set RIR.

Smart Rest Alert

Set rest targets for compounds, isolations & warm-ups — get alerted on phone & watch when it's time.

Edit Past Workouts

Fix a typo or a missed set after finishing — your history stays accurate, PRs update automatically.

Why Athletes Choose GymPsycho

Built by a lifter. For lifters who already know what they're doing.

1

Zero Friction

No account. No sign-up. Start training in seconds.

2

100% Private

Your device only. No tracking, no ads. Ever.

3

Real PR Logic

Only true PRs count. No fake records from reducing weight.

4

Own Your Data

PDF exports, complete history. Never locked in.

5

No Cloud AI

Smart insights stay on your phone. Never uploaded.

6

Multi-Gym Ready

Separate PRs, exercises, settings & weight units (kg/lbs) per gym. Switch locations in one tap.

The Workout Tracker Built for Hypertrophy

Muscle growth isn't luck — it's volume, intensity and consistency, tracked properly.

If you're looking for the best workout tracker for hypertrophy in 2026, it's not the feature list that matters — it's what actually builds muscle: progressive overload, weekly volume per muscle in the productive range (MEV → MAV → MRV), proximity to failure — track RIR on every set if you want it in the data — and consistency week after week. GymPsycho turns your training log into a real hypertrophy system.

1

Volume per Muscle

Weekly sets on real MEV/MAV/MRV landmarks — no junk volume.

2

Per-Muscle Progress Check

See which muscle is actually growing and which is stalling — and fix it in one tap.

3

Plateau Detection

Deload guidance before you stall — timed to your data.

4

Plans in 60 Seconds

Hypertrophy-optimized training weeks, science-based. Free.

Train Smarter — Learn the Science

Short, practical guides on what actually drives muscle growth and strength.

Marc - Founder of GymPsycho

Built by a Lifter

I didn't set out to build a fitness app.
I set out to fix a problem in my own training.

After years of serious lifting, every app felt wrong: too slow, too bloated, too generic — built for casual users, not for people who actually train.

So I built GymPsycho.

No accounts. No ads. No social feed.
Just clean data, real PRs, and tools that work under the bar.

Every feature exists because it solved a real problem in my own training. Nothing more. Nothing less.

— Marc Berbet, Founder @gym.marky
Read the full story →

Simple, Transparent Pricing

GymPsycho is free forever, with every training feature. Everyone without a subscription also gets every Pro feature free for 60 days.

FREE FOREVER
Free
$ 0

Every training feature included

  • ✓ Plan Generator — plans in 60s
  • ✓ Plan Sharing & Data Import
  • ✓ Training log, PR tracking, rest timer
  • ✓ Exercise charts of the last 3 months
  • ✓ Training Maturity & Gamification
  • ✓ Apple Watch + Wear OS, Live Activity
  • ✓ HealthKit & Health Connect
  • ✓ Unlimited plans, 1 gym
Download Free
60 DAYS OF PRO FREE
Pro
$ 49.99 / year

or $6.99/month · 60 days of Pro free

  • ✓ Everything in Free
  • ✓ Progress Check per muscle
  • ✓ AI weight suggestions & insights
  • ✓ Multiple gyms with separate PRs
  • ✓ Body-Weight Intelligence & PDF Reports
  • ✓ Full exercise chart history
Get 60 days of Pro free

Frequently Asked Questions

Quick answers to common questions about GymPsycho.

Is GymPsycho free? +
Yes! GymPsycho is free to use forever. The Plan Generator, Plan Sharing, Data Import, unlimited plans, training log, PR tracking, exercise charts of the last 3 months, Training Maturity, Apple Watch & Wear OS are all free. On top of that, everyone without a subscription gets every Pro feature free for 60 days — once, automatically, no purchase needed. After that, everything above stays free — only the Pro analytics layer needs a subscription: Progress Check per muscle, AI weight suggestions, plateau & volume analysis, the full exercise chart history, Body Weight Intelligence, PDF Reports and Multi-Gym, for $6.99/month or $49.99/year.
Do I need to create an account? +
No account required. GymPsycho works instantly without sign-up. Your data stays private on your device. On iOS, it syncs via iCloud. On Android, you can export and import backups manually.
Does GymPsycho work with Apple Watch? +
Yes! GymPsycho includes a full Apple Watch app. Your current set, rest timer, live heart rate and PR celebrations are on your wrist, and you can restart the rest timer from there — sets are ticked off in the phone app.
Does GymPsycho work with Wear OS, Pixel Watch, or Galaxy Watch? +
Yes! GymPsycho includes a native Wear OS app for Pixel Watch and Galaxy Watch (Wear OS 3+). Your current set, rest timer with haptics, live heart rate and PR celebrations are on your wrist while the paired phone keeps the log.
Does GymPsycho work with iPhone Duo? +
Yes! GymPsycho is optimized for iPhone Duo. With iPhone Duo closed, you get the familiar iPhone layout with the tab bar on the camera side. Open in landscape and full screen, training splits into two columns: an overview with the rest timer, every exercise of your workout, the AI suggestion for the next set (Pro) and the trend of the current exercise, and next to the tab bar your set input. Menus, pickers and confirmation dialogs from the training open in the half they were opened from instead of across the fold. Open in portrait or half-folded like a laptop, the app shows one centered column. You can fold or unfold mid-set without losing what you entered. The same two-column view also works on iPad in landscape and full screen.
Can I edit my workout plans on a computer? +
Yes, with the web plan editor: open web.gympsycho.com on your computer, scan the QR code with the GymPsycho app and confirm on your phone — then edit plans, exercises, sets, reps and weights with a keyboard on a big screen. Every change is saved on your phone; the connection is end-to-end encrypted, nothing is stored on a server and there is no account. The app stays open on the phone while you edit.
Can I use GymPsycho at multiple gyms? +
Yes, with GymPsycho Pro. The free tier includes 1 gym. Pro unlocks multi-gym with separate PRs, exercises, weight units (kg/lbs), and settings per location.
How is GymPsycho different from Strong or Hevy? +
GymPsycho is built for lifters who value speed and data. Key differentiators: Plan Generator for personalized training plans, multi-gym PR tracking, on-device AI intelligence (no cloud), PR Reset for context changes, real PR logic, zero-friction privacy, a curated exercise library with animated demonstrations, and one-tap import of your training history from Strong, Hevy, or Alpha Progression. See our detailed comparisons: GymPsycho vs Strong | GymPsycho vs Hevy
Does GymPsycho work offline? +
Yes, GymPsycho works 100% offline. Perfect for basement gyms, outdoor training, or locations without internet. Everything is stored on your device; on iOS, iCloud sync catches up automatically once you're back online.
What is PR Reset? +
PR Reset lets you set a new PR baseline per exercise when context changes — like new equipment, technique adjustments, or returning from injury. Your complete training history stays intact while progress tracking starts fresh.
Can I export my workout data? +
Yes. A complete backup of your data (JSON) is free on iOS and Android and can be imported again on either platform. With GymPsycho Pro you also get professional PDF workout reports with your name on them, including training history and volume analytics.
Can I import data from other workout apps? +
Yes! GymPsycho can import your complete training history from Hevy, Strong, and Alpha Progression via CSV export — free for everyone. Sessions, exercises, and plans are imported with smart exercise matching.
Is GymPsycho available on Android? +
Yes! GymPsycho is available on both iOS and Android. The Android version includes Health Connect integration, a persistent workout notification, and full backup export/import. All core features — training, PRs, AI, plans — work identically on both platforms.
Can GymPsycho create a personalized training plan? +
Yes! GymPsycho includes a free Plan Generator that creates science-based, personalized training plans in under 60 seconds. Go through 8 quick steps — training days, equipment, experience, goal, recovery, muscle priorities, session length, and limitations — and get ready-to-use plans tailored to your needs. The generator uses the same sports science (MEV/MAV/MRV volume landmarks) as the built-in volume tracking. Free for everyone, no Pro required.
Is GymPsycho good for hypertrophy (muscle growth)? +
Yes — GymPsycho is built for hypertrophy. Every core feature is engineered around what actually drives muscle growth: progressive overload, weekly volume per muscle in the productive range (MEV → MAV → MRV), proximity to failure (tracked per set with optional RIR), and consistency over time. The Plan Generator builds hypertrophy-optimized weeks based on the latest research, the Progress Check shows per-muscle progression and turns every off-range verdict into a one-tap plan fix — extra sets, or a complementary second exercise when a movement is already maxed out — so volume tracking keeps you in the sweet spot for growth, not junk volume. Warm-up, drop, and failure set tagging keeps trends honest — a lighter drop set never reads as lost strength. GymPsycho was also an official sponsor of the 2026 Olympia in Las Vegas.
Does GymPsycho support supersets? +
Yes! GymPsycho supports supersets and giant sets — group two or more exercises and the app guides you through each round with automatic alternation, smart rest logic (rest fires at the end of a round, not between partners), and full support in plans, workout history, and PDF reports. Free for everyone.
Do I enter the weight of one dumbbell or both combined? +
One dumbbell. Pressing two 35 lb dumbbells means you enter 35 lb — the same convention Hevy and Strong use, so an imported history lines up 1:1. For alternating or single-arm exercises, log the reps per arm: 10 alternating curls each side is 10 reps, not 20. GymPsycho thinks in real dumbbell steps, so an AI suggestion of 35 → 40 means grab the next pair up. Barbell exercises are the opposite — enter the total load, bar plus all plates. Whichever you log, stay consistent per exercise, because PRs and estimated 1RM trends compare your entries over time.
How do I know which plates to load per side? +
Enter your target weight in the free barbell plate calculator (per side, kg and lb) and it shows which plates go on each side of the bar. You choose the bar — men's or women's Olympic bar, EZ-curl bar, trap bar, safety squat bar or a custom weight — and switch between kg and lb. It runs in your browser, no app or account needed.
Can I edit a completed workout? +
Yes. Open any completed session in your history and edit sets, weights, reps, and notes — fix a typo or add a forgotten set after the fact. PRs and analytics update automatically. You can also tag warm-up sets so they don't distort your working-set analytics.

Ready to Train Smarter?

Download GymPsycho for free. No account needed.

Free forever · every Pro feature free for 60 days · Pro from $6.99/month